The realization of renovation works can quickly cause problems for the owner:
Lack of signed contracts with the contractors makes it very difficult to enforce the contractors’ obligations;
The bankruptcy of one of the contractors blocks the continuation of the work;
The bad coordination of the contractors between them can disorganized the building site and lengthen the delays;
The absence of anticipation on the financing of the work can create abandonment of the site;
A bad holding of the appointment of reception of building site can make very difficult the realization of the possible non-buildings and defects;
The present guide allows you to identify all these problems in order to anticipate them.